Six Sigma

The often-used six sigma symbol.
Part of a series of articles on
Industry
Mill
Manufacturing methods

Batch production • Job production

Continuous production

Improvement methods

LM • TPM • QRM • VDM

TOC • Six Sigma • RCM

Information & communication

ISA-88 • ISA-95 • ERP

SAP • IEC 62264 • B2MML

Process control

PLC • DCS

Six Sigma is a business management strategy originally developed by Motorola, USA in 1981.[1] As of 2010, it enjoys widespread application in many sectors of industry, although its application is not without controversy.

Six Sigma seeks to improve the quality of process outputs by identifying and removing the causes of defects (errors) and minimizing variability in manufacturing and business processes.[2] It uses a set of quality management methods, including statistical methods, and creates a special infrastructure of people within the organization ("Black Belts", "Green Belts", etc.) who are experts in these methods.[2] Each Six Sigma project carried out within an organization follows a defined sequence of steps and has quantified financial targets (cost reduction or profit increase).[2]

The term six sigma originated from terminology associated with manufacturing, specifically terms associated with statistical modelling of manufacturing processes. The maturity of a manufacturing process can be described by a sigma rating indicating its yield, or the percentage of defect-free products it creates. A six-sigma process is one in which 99.99966% of the products manufactured are statistically expected to be free of defects (3.4 defects per million). Motorola set a goal of "six sigmas" for all of its manufacturing operations, and this goal became a byword for the management and engineering practices used to achieve it.

Contents

Historical overview

Six Sigma originated as a set of practices designed to improve manufacturing processes and eliminate defects, but its application was subsequently extended to other types of business processes as well.[3] In Six Sigma, a defect is defined as any process output that does not meet customer specifications, or that could lead to creating an output that does not meet customer specifications.[2]

Bill Smith first formulated the particulars of the methodology at Motorola in 1986.[4] Six Sigma was heavily inspired by six preceding decades of quality improvement methodologies such as quality control, TQM, and Zero Defects,[5][6] based on the work of pioneers such as Shewhart, Deming, Juran, Ishikawa, Taguchi and others.

Like its predecessors, Six Sigma doctrine asserts that:

Features that set Six Sigma apart from previous quality improvement initiatives include:

The term "Six Sigma" comes from a field of statistics known as process capability studies. Originally, it referred to the ability of manufacturing processes to produce a very high proportion of output within specification. Processes that operate with "six sigma quality" over the short term are assumed to produce long-term defect levels below 3.4 defects per million opportunities (DPMO).[7][8] Six Sigma's implicit goal is to improve all processes to that level of quality or better.

Six Sigma is a registered service mark and trademark of Motorola Inc.[9] As of 2006 Motorola reported over US$17 billion in savings[10] from Six Sigma.

Other early adopters of Six Sigma who achieved well-publicized success include Honeywell (previously known as AlliedSignal) and General Electric, where Jack Welch introduced the method.[11] By the late 1990s, about two-thirds of the Fortune 500 organizations had begun Six Sigma initiatives with the aim of reducing costs and improving quality.[12]

In recent years, some practitioners have combined Six Sigma ideas with lean manufacturing to yield a methodology named Lean Six Sigma.

Methods

Six Sigma projects follow two project methodologies inspired by Deming's Plan-Do-Check-Act Cycle. These methodologies, composed of five phases each, bear the acronyms DMAIC and DMADV.[12]

DMAIC

The DMAIC project methodology has five phases:

DMADV

The DMADV project methodology, also known as DFSS ("Design For Six Sigma"),[12] features five phases:

Quality management tools and methods used in Six Sigma

Within the individual phases of a DMAIC or DMADV project, Six Sigma utilizes many established quality-management tools that are also used outside of Six Sigma. The following table shows an overview of the main methods used.

  • 5 Whys
  • Analysis of variance
  • ANOVA Gauge R&R
  • Axiomatic design
  • Business Process Mapping
  • Catapult exercise on variability
  • Cause & effects diagram (also known as fishbone or Ishikawa diagram)
  • Chi-square test of independence and fits
  • Control chart
  • Correlation
  • Cost-benefit analysis
  • CTQ tree
  • Design of experiments
  • Failure mode and effects analysis (FMEA)
  • General linear model
  • Histograms
  • [[Homoscedasticity] ]
  • Quality Function Deployment (QFD)
  • Pareto chart
  • Pick chart
  • Process capability
  • Quantitative marketing research through use of Enterprise Feedback Management (EFM) systems
  • Regression analysis
  • Root cause analysis
  • Run charts
  • SIPOC analysis (Suppliers, Inputs, Process, Outputs, Customers)
  • Stratification
  • Taguchi methods
  • Taguchi Loss Function
  • TRIZ

Implementation roles

One key innovation of Six Sigma involves the "professionalizing" of quality management functions. Prior to Six Sigma, quality management in practice was largely relegated to the production floor and to statisticians in a separate quality department. Formal Six Sigma programs borrow martial arts ranking terminology to define a hierarchy (and career path) that cuts across all business functions.

Six Sigma identifies several key roles for its successful implementation.[13]

Some organizations use additional belt colours, such as Yellow Belts, for employees that have basic training in Six Sigma tools.

Certification

In the United States, Six Sigma certification for both Green and Black Belts is offered by the Institute of Industrial Engineers[14] and by the American Society for Quality.[15]

In addition to these examples, there are many other organizations and companies that offer certification. There currently is no central certification body, either in the United States or anywhere else in the world.

Origin and meaning of the term "six sigma process"

Graph of the normal distribution, which underlies the statistical assumptions of the Six Sigma model. The Greek letter σ (sigma) marks the distance on the horizontal axis between the mean, µ, and the curve's inflection point. The greater this distance, the greater is the spread of values encountered. For the curve shown above, µ = 0 and σ = 1. The upper and lower specification limits (USL, LSL) are at a distance of 6σ from the mean. Because of the properties of the normal distribution, values lying that far away from the mean are extremely unlikely. Even if the mean were to move right or left by 1.5σ at some point in the future (1.5 sigma shift), there is still a good safety cushion. This is why Six Sigma aims to have processes where the mean is at least 6σ away from the nearest specification limit.

The term "six sigma process" comes from the notion that if one has six standard deviations between the process mean and the nearest specification limit, as shown in the graph, practically no items will fail to meet specifications.[8] This is based on the calculation method employed in process capability studies.

Capability studies measure the number of standard deviations between the process mean and the nearest specification limit in sigma units. As process standard deviation goes up, or the mean of the process moves away from the center of the tolerance, fewer standard deviations will fit between the mean and the nearest specification limit, decreasing the sigma number and increasing the likelihood of items outside specification.[8]

Role of the 1.5 sigma shift

Experience has shown that processes usually do not perform as well in the long term as they do in the short term.[8] As a result, the number of sigmas that will fit between the process mean and the nearest specification limit may well drop over time, compared to an initial short-term study.[8] To account for this real-life increase in process variation over time, an empirically-based 1.5 sigma shift is introduced into the calculation.[8][16] According to this idea, a process that fits six sigmas between the process mean and the nearest specification limit in a short-term study will in the long term only fit 4.5 sigmas – either because the process mean will move over time, or because the long-term standard deviation of the process will be greater than that observed in the short term, or both.[8]

Hence the widely accepted definition of a six sigma process as one that produces 3.4 defective parts per million opportunities (DPMO). This is based on the fact that a process that is normally distributed will have 3.4 parts per million beyond a point that is 4.5 standard deviations above or below the mean (one-sided capability study).[8] So the 3.4 DPMO of a "Six Sigma" process in fact corresponds to 4.5 sigmas, namely 6 sigmas minus the 1.5 sigma shift introduced to account for long-term variation.[8] This takes account of special causes that may cause a deterioration in process performance over time and is designed to prevent underestimation of the defect levels likely to be encountered in real-life operation.[8]

Sigma levels

A control chart depicting a process that experienced a 1.5 sigma drift in the process mean toward the upper specification limit starting at midnight. Control charts are used to maintain 6 sigma quality by signaling when quality professionals should investigate a process to find and eliminate special-cause variation.

The table[17][18] below gives long-term DPMO values corresponding to various short-term sigma levels.

Note that these figures assume that the process mean will shift by 1.5 sigma toward the side with the critical specification limit. In other words, they assume that after the initial study determining the short-term sigma level, the long-term Cpk value will turn out to be 0.5 less than the short-term Cpk value. So, for example, the DPMO figure given for 1 sigma assumes that the long-term process mean will be 0.5 sigma beyond the specification limit (Cpk = –0.17), rather than 1 sigma within it, as it was in the short-term study (Cpk = 0.33). Note that the defect percentages only indicate defects exceeding the specification limit to which the process mean is nearest. Defects beyond the far specification limit are not included in the percentages.

Sigma level DPMO Percent defective Percentage yield Short-term Cpk Long-term Cpk
1 691,462 69% 31% 0.33 –0.17
2 308,538 31% 69% 0.67 0.17
3 66,807 6.7% 93.3% 1.00 0.5
4 6,210 0.62% 99.38% 1.33 0.83
5 233 0.023% 99.977% 1.67 1.17
6 3.4 0.00034% 99.99966% 2.00 1.5
7 0.019 0.0000019% 99.9999981% 2.33 1.83

Software used for Six Sigma

List of Six Sigma companies

Criticism

Lack of originality

Noted quality expert Joseph M. Juran has described Six Sigma as "a basic version of quality improvement", stating that "[t]here is nothing new there. It includes what we used to call facilitators. They've adopted more flamboyant terms, like belts with different colors. I think that concept has merit to set apart, to create specialists who can be very helpful. Again, that's not a new idea. The American Society for Quality long ago established certificates, such as for reliability engineers."[19]

Role of consultants

The use of "Black Belts" as itinerant change agents has (controversially) fostered an industry of training and certification. Critics argue there is overselling of Six Sigma by too great a number of consulting firms, many of which claim expertise in Six Sigma when they only have a rudimentary understanding of the tools and techniques involved.[2]

Potential negative effects

A Fortune article stated that "of 58 large companies that have announced Six Sigma programs, 91 percent have trailed the S&P 500 since". The statement is attributed to "an analysis by Charles Holland of consulting firm Qualpro (which espouses a competing quality-improvement process)."[20] The summary of the article is that Six Sigma is effective at what it is intended to do, but that it is "narrowly designed to fix an existing process" and does not help in "coming up with new products or disruptive technologies." Advocates of Six Sigma have argued that many of these claims are in error or ill-informed.[21][22]

A BusinessWeek article says that James McNerney's introduction of Six Sigma at 3M may have had the effect of stifling creativity. It cites two Wharton School professors who say that Six Sigma leads to incremental innovation at the expense of blue-sky work.[23] This phenomenon is further explored in the book, Going Lean, which describes a related approach known as lean dynamics and provides data to show that Ford's "6 Sigma" program did little to change its fortunes.[24]

Based on arbitrary standards

While 3.4 defects per million opportunities might work well for certain products/processes, it might not operate optimally or cost effectively for others. A pacemaker process might need higher standards, for example, whereas a direct mail advertising campaign might need lower standards. The basis and justification for choosing 6 (as opposed to 5 or 7, for example) as the number of standard deviations is not clearly explained. In addition, the Six Sigma model assumes that the process data always conform to the normal distribution. The calculation of defect rates for situations where the normal distribution model does not apply is not properly addressed in the current Six Sigma literature.[2]

Criticism of the 1.5 sigma shift

The statistician Donald J. Wheeler has dismissed the 1.5 sigma shift as "goofy" because of its arbitrary nature.[25] Its universal applicability is seen as doubtful.[2]

The 1.5 sigma shift has also become contentious because it results in stated "sigma levels" that reflect short-term rather than long-term performance: a process that has long-term defect levels corresponding to 4.5 sigma performance is, by Six Sigma convention, described as a "6 sigma process."[8][26] The accepted Six Sigma scoring system thus cannot be equated to actual normal distribution probabilities for the stated number of standard deviations, and this has been a key bone of contention about how Six Sigma measures are defined.[26] The fact that it is rarely explained that a "6 sigma" process will have long-term defect rates corresponding to 4.5 sigma performance rather than actual 6 sigma performance has led several commentators to express the opinion that Six Sigma is a confidence trick.[8]

See also

References

  1. Tennant, Geoff (2001). SIX SIGMA: SPC and TQM in Manufacturing and Services. Gower Publishing, Ltd.. p. 6. ISBN 0566083744. http://books.google.com/?id=O6276jidG3IC&printsec=frontcover#PPA6,M1. 
  2. 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 Antony, Jiju. "Pros and cons of Six Sigma: an academic perspective". http://web.archive.org/web/20080723015058/http://www.onesixsigma.com/node/7630. Retrieved August 5, 2010. 
  3. "Motorola University - What is Six Sigma?". http://www.motorola.com/content/0,,3088,00.html. Retrieved 2009-09-14. "[...] Six Sigma started as a defect reduction effort in manufacturing and was then applied to other business processes for the same purpose." 
  4. "The Inventors of Six Sigma". http://www.motorola.com/content/0,,3079,00.html. Retrieved January 29, 2006. 
  5. Stamatis, D. H. (2004). Six Sigma Fundamentals: A Complete Guide to the System, Methods, and Tools. New York, New York: Productivity Press. p. 1. ISBN 9781563272929. OCLC 52775178. "The practitioner of the six sigma methodology in any organization should expect to see the use of old and established tools and approaches in the pursuit of continual improvement and customer satisfaction. So much so that even TQM (total quality management) is revisited as a foundation of some of the approaches. In fact, one may define six sigma as "TQM on steroids."" 
  6. Montgomery, Douglas C. (2009). Statistical Quality Control: A Modern Introduction (6 ed.). Hoboken, New Jersey: John Wiley & Sons. p. 23. ISBN 9780470233979. OCLC 244727396. "During the 1950s and 1960s programs such as Zero Defects and Value Engineering abounded, but they had little impact on quality and productivity improvement. During the heyday of TQM in the 1980s, another popular program was the Quality Is Free initiative, in which management worked on identifying the cost of quality..." 
  7. "Motorola University Six Sigma Dictionary". http://www.motorola.com/content/0,,3074-5804,00.html#ss. Retrieved January 29, 2006. 
  8. 8.00 8.01 8.02 8.03 8.04 8.05 8.06 8.07 8.08 8.09 8.10 8.11 Tennant, Geoff (2001). SIX SIGMA: SPC and TQM in Manufacturing and Services. Gower Publishing, Ltd.. pp. 25. ISBN 0566083744. http://books.google.com/?id=O6276jidG3IC&printsec=frontcover#PPA25,M1. 
  9. "Motorola Inc. - Motorola University". http://www.motorola.com/motorolauniversity. Retrieved January 29, 2006. 
  10. "About Motorola University". http://www.motorola.com/content/0,,3071-5801,00.html. Retrieved January 29, 2006. 
  11. "Six Sigma: Where is it now?". http://scm.ncsu.edu/public/facts/facs030624.html. Retrieved May 22, 2008. 
  12. 12.0 12.1 12.2 12.3 12.4 De Feo, Joseph A.; Barnard, William (2005). JURAN Institute's Six Sigma Breakthrough and Beyond - Quality Performance Breakthrough Methods. Tata McGraw-Hill Publishing Company Limited. ISBN 0-07-059881-9. 
  13. Harry, Mikel; Schroeder, Richard (2000). Six Sigma. Random House, Inc. ISBN 0-385-49437-8. 
  14. "Institute of Industrial Engineers Six Sigma certifications". Norcross, Georgia: Institute of Industrial Engineers. http://www.iienet2.org/Seminars/SeminarGroup.aspx?id=12936&seminar=6SC&grp=ICP. Retrieved 2010-01-05. 
  15. "Certification - ASQ". Milwaukee, Wisconsin: American Society for Quality. http://www.asq.org/certification/index.html. Retrieved 2010-01-05. 
  16. Harry, Mikel J. (1988). The Nature of six sigma quality. Rolling Meadows, Illinois: Motorola University Press. p. 25. ISBN 9781569460092. 
  17. Gygi, Craig; DeCarlo, Neil; Williams, Bruce (2005). Six Sigma for Dummies. Hoboken, NJ: Wiley Publishing, Inc.. pp. Front inside cover, 23. ISBN 0-7645-6798-5. 
  18. El-Haik, Basem; Suh, Nam P.. Axiomatic Quality. John Wiley and Sons. p. 10. ISBN 9780471682738. 
  19. Paton, Scott M. (August 2002). Juran: A Lifetime of Quality. 22. pp. 19–23. http://www.qualitydigest.com/aug02/articles/01_article.shtml. Retrieved 2009-04-01. 
  20. Morris, Betsy (2006-07-11). "Tearing up the Jack Welch playbook". Fortune. http://money.cnn.com/2006/07/10/magazines/fortune/rule4.fortune/index.htm. Retrieved 2006-11-26. 
  21. Richardson, Karen (2007-01-07). "The 'Six Sigma' Factor for Home Depot". Wall Street Journal Online. http://online.wsj.com/article/SB116787666577566679.html. Retrieved October 15, 2007. 
  22. Ficalora, Joe; Costello, Joe. "Wall Street Journal SBTI Rebuttal" (PDF). Sigma Breakthrough Technologies, Inc.. http://www.sbtionline.com/files/Wall_Street_Journal_SBTI_Rebuttal.pdf. Retrieved October 15, 2007. 
  23. Hindo, Brian (6 June 2007). "At 3M, a struggle between efficiency and creativity". Business Week. http://www.businessweek.com/magazine/content/07_24/b4038406.htm?chan=top+news_top+news+index_best+of+bw. Retrieved June 6, 2007. 
  24. Ruffa, Stephen A. (2008). Going Lean: How the Best Companies Apply Lean Manufacturing Principles to Shatter Uncertainty, Drive Innovation, and Maximize Profits. AMACOM (a division of American Management Association). ISBN 0-8144-1057-X. http://books.google.com/?id=_Q7OGDd61hkC. 
  25. Wheeler, Donald J. (2004). The Six Sigma Practitioner's Guide to Data Analysis. SPC Press. p. 307. ISBN 9780945320623. 
  26. 26.0 26.1 *Pande, Peter S.; Neuman, Robert P.; Cavanagh, Roland R. (2001). The Six Sigma Way: How GE, Motorola, and Other Top Companies are Honing Their Performance. New York: McGraw-Hill Professional. p. 229. ISBN 0071358064. http://books.google.com/?id=ybOuvzvcqTAC&pg=PA229&lpg=PA229&dq=%22key+bones+of+contention+amongst+the+statistical+experts+about+how+Six+Sigma+measures+are+defined%22. 

Further reading